For more detailed technical information, including key design features and installation options, enter your password to download the Excalibur™ Drilled Pile Anchoring System Technical Manual.
Password:
Click here to request a password
.
Mooring Termination
The mooring line is pre-connected to the swivel. This arrangement allows the pile to be deployed without the need for orientation. A number of swivel and termination designs are available.
The Excalibur™ drilled pile is a patented product © Liberty Offshore Ltd 2002